Back to concernsReport a different issue
OpenAccess gap (road, path, or trail)ID: 6qMvz0vg
University Bridge construction area – Bike lane hazards and gaps
Around the University Bridge construction site, many of the existing bike paths have been disrupted or rerouted, which is to be expected. But some areas seem to be have too little signage pointing out hazards or ends to bike paths.
1
reports
Jul 10, 2026
first seen
Jul 10, 2026
last seen
Seen this too? Add a report with your time, place, and context so this concern has stronger documentation.
Checking sign-inLinked reports
A short sample of reports already attached to this concern.
